Our Projects

The Northern Road Stage 5 and Stage 6

Photo Sources:

Photo 1 –  https://www.insideconstruction.com.au
Photo 2 –  https://www.iscouncil.org/

The Northern Road Stage 5 and Stage 6, Luddenham, NSW

Client: CPB Contractors Pty Ltd

Project Value: AUD $270M

Project Contract Type: Construct

Project Details: The Northern Road Stage 5 & 6

  • These complex projects were delivered for Transport for NSW (TfNSW) and important components of the Western Sydney Infrastructure Plan. Stage 5 ($150M) upgraded 6.7km of road from two lanes to a divided four-lane alignment, with the provision of kerbside bus lanes at each intersection. Stage 6 ($120M) upgraded 3.7km of existing two-lane road to deliver a four-lane divided road and 2.5km of local arterial roads and adjust public utilities.
  • Projects included earthworks formations, pavements, stormwater drainage and drainage structures such as hydraulic box culverts.

Project Status: Completed

Services Provided:
Quantity Surveying

  • Project Quantity Analysis and Take-off
  • BoQ Preparation
  • Assessment, Preparation, Negotiation of Project Variations

Engineering

  • Project Design Review
  • Design Changes Analysis

Infrastructure Project Service

  • Procurement and Tenderin
  • Construction Contract and Commercial Advisor
  • Construction and Project Management

Estimating and Project Cost Analysis

  • Project Cost Estimation
  • Project Cost Analysis

Claim

  • Covid-19 Quantum Assessment, Calculation, and Substantiation

We manage data that is critical to the success of your project.

Scroll to Top